Preparation of the facility chases

 

The laying of the systems is easy, fast and clean, since it does not require any masonry work.   

 

 

 

 

 

The chases in the polystyrene are carried out by means of a hot-air generator and the system canalizations are laid behind the metal mesh. 

 

 

 

 

 

In case of rigid or semirigid pipes, the metal mesh is cut in the required length by using normal shears and then restored with portions of reinforcement plane meshes.