• Company and Values
    • mdue en seymour-airport-n2 001
    • COMPANY AND VALUES
    • Identity and History
    • Vision and Mission
    • Quality and environment policy
    • Environmental impact
    • Sustainable Development Goals
    • Emmedue in the World
  • Building System
    • mdue en seymour-airport-n2 001
    • OUR BUILDING SYSTEM
    • Emmedue System
    • Emmedue Panel
    • Applications of the System
    • Ecosystem and Business Model
  • Plants and Services
    • mdue en seymour-airport-n2 001
    • PLANTS AND SERVICES
    • Emmedue Package
    • They say about us
  • Projects
    • mdue en seymour-airport-n2 001
    • PROJECTS
    • Gallery
    • Best cases
  • Challenges
  • Contacts
CONTACT US

Unsupported Browser

This site probably won't work great in this browser.
We generally only support the recent versions of major browsers like:
 Chrome, Firefox, and Edge.

Dismiss & Try Anyway

News Events Knowledge Community
Eng mdue en seymour-airport-n2 005
It
Es
Fr
Ru
Pt
  • Company and Values
    • mdue en seymour-airport-n2 001
    • COMPANY AND VALUES
    • Identity and History
    • Vision and Mission
    • Quality and environment policy
    • Environmental impact
    • Sustainable Development Goals
    • Emmedue in the World
  • Building System
    • mdue en seymour-airport-n2 001
    • OUR BUILDING SYSTEM
    • Emmedue System
    • Emmedue Panel
    • Applications of the System
    • Ecosystem and Business Model
  • Plants and Services
    • mdue en seymour-airport-n2 001
    • PLANTS AND SERVICES
    • Emmedue Package
    • They say about us
  • Projects
    • mdue en seymour-airport-n2 001
    • PROJECTS
    • Gallery
    • Best cases
  • Challenges
  • Contacts
Seymour Airport

Seymour Airport

GALAPAGOS, ECUADOR
public buildings

A structure built in harmony with the surrounding nature.

Located in Baltra Island, one of the islands of the Galapagos Archipelago in Ecuador, Seymour Airport is the first of its kind in the world. It was inaugurated in 2012 and is one of the main gateways for tourists travelling to the Galapagos Islands, managing an annual traffic volume of about 300,000 passengers.

Also known as the Ecological Airport of the Galapagos, it has been designed and built in harmony with the surrounding nature in order to reduce the environmental impact. The achievement of this goal has allowed it to obtain recognition from the United States Green Building Council, an important reference for ecological buildings in accordance with the best environmental practices in the world. Furthermore, it has been awarded the LEED Gold level certification (Leadership in Energy and Environmental Design).

Designed with the aim of creating an ecological structure, the airport was built with the Emmedue Advanced Building System. A winning choice, it is. In fact, Emmedue allows you to build energy efficient buildings that meet the highest standards and reduce CO2 emissions.

mdue en seymour-airport-n2 010
mdue en seymour-airport-n2 011
By virtue of the bioclimatic project carried out with the aim of maintaining a constant thermal comfort throughout the year, in a large part of the building the air conditioning has not been set up. The Emmedue panels play an important part; in fact, they allow optimal thermal insulation levels, which is one of the main characteristics of expanded polystyrene, which eliminates all thermal bridges.
This aspect of the Emmedue System is because its panel is equipped with a continuous polystyrene core.
In this way the System allows the drastic decrease of energy consumption, favoring strategies aimed at sustainable development. According to certified analysis, by using the Emmedue Advanced Building System, the construction of the Seymour Airport obtained a reduction of 60% in CO2 emissions. Approximately 75% of the materials of the old terminal of the Ecological Airport of the Galapagos have been reused for the construction of the new structure. This was possible thanks to the high adaptability of the Emmedue Advanced Building System; in fact, the System is easily integrated with other building systems. 

FACTS AND FIGURES
Customer:ECOGAL S.A., Corporación América
End of works:2012
Building materials:recycled metal structure
volcanic stones finishes
Area:6.000 sqm
Awards:LEED Gold Certification,
Architectural Green Project,
Airport Carbon Accreditation Level 4

Seymour Airport

Galapagos, Ecuador
lat. 0°27’1.3’’ S
​long. 90°16’6.251’’ O
View map
View all
Best cases
View all ›
mdue en seymour-airport-n2 013 mdue en seymour-airport-n2 014
mdue en seymour-airport-n2 015
villas

Santa Rosa Beach Villa

Florida, United States of America
mdue en seymour-airport-n2 016
multi-storey buildings

Green Tower

LA PAZ, BOLIVIA
mdue en seymour-airport-n2 017
residential buildings

Curan Curani residential area

LA PAZ, BOLIVIA
mdue en seymour-airport-n2 018
social housing

Praderas de San Lorenzo

Caimitillo, Panama City - Panama
mdue en seymour-airport-n2 019
social housing

Urbanization Tacarigua V

Los Guayos, Carabobo - Venezuela
START YOUR PROJECT

Request
more information

Mandatory Fields *
JOIN OUR NEWSLETTER
HEAD OFFICE

M2 Emmedue
Via Toniolo. 39/B
61032 Fano (Pu) - Italy
P.Iva 02839330418 - Privacy & Cookie Policy - Cookie preferences
CONTACTS

Tel. +39 0721 631365
E-mail: info@mdue.it
Credits TITANKA! Spa © 2018